28 results
6-K
EX-99.2
ORLA
Orla Mining Ltd
3 Aug 23
Condensed Interim Consolidated Financial Statements
5:07pm
dump, open pits, and processing areas.
Evaluate the availability of local services and personnel to maximize local hiring and procurement.
Investigate
6-K
EX-99.2
ORLA
Orla Mining Ltd
11 May 23
Condensed Interim Consolidated Financial Statements
6:38pm
geotechnical studies at the proposed heap leach, waste rock dump, open pits, and processing areas.
Evaluate the availability of local services
6-K
EX-99.1
ORLA
Orla Mining Ltd
29 Nov 22
Report of Foreign Private Issuer for the Month of November 2022
6:41pm
, and in Sections 3, 4, 5, 6, 8, and 9 in T30N, R53E (Dufresne and Nicholls, 2017b). AMAX also conducted surface dump and rock chip sampling, soil sampling
6-K
EX-99.2
ORLA
Orla Mining Ltd
10 Nov 22
Condensed Interim Consolidated Financial Statements
5:27pm
, Caballito, La Pelona, and La Prieta for gold-copper mineralization. The current design allows the heap leach pad and the waste rock dump … and groundwater flows, quality, storage, and treatment.
Complete additional geotechnical studies at the proposed heap leach, waste rock dump, open pits
6-K
EX-99.2
ORLA
Orla Mining Ltd
8 Aug 22
Condensed Interim Consolidated Financial Statements
5:53pm
leach pad and the waste rock dump to accommodate additional tonnage in the upstream site of those facilities if required.
Based on the results … at the proposed heap leach, waste rock dump, open pits, and processing areas.
Evaluate the availability of local services and personnel to maximize local hiring
6-K
EX-99.2
k3jyo469rjml5jcchaga
12 May 22
Condensed Interim Consolidated Financial Statements
5:19pm
40-F
EX-99.2
1j1mpem5y0 kfy7q0fji
18 Mar 22
Annual report (Canada)
9:18pm
40-F
EX-99.1
b8s08zi0lr54i2e0
18 Mar 22
Annual report (Canada)
9:18pm
6-K
EX-99.1
8asdnhtp0mz1gvn14slt
20 Jan 22
Updated NI 43-101 Technical Report on the Cerro Quema Project
4:27pm
6-K
EX-99.2
xxanwnw wy1b6rxiurhx
15 Nov 21
Condensed Interim Consolidated Financial Statements
6:52am
6-K
EX-99.2
hrep8e7
7 Sep 21
Orla Mining Files Cerro Quema Oxide Project Pre-feasibility Study Technical Report
5:25pm
6-K
EX-99.1
6w0m2qfq2 epo
9 Aug 21
Material Change Report Under National Instrument 51-102
4:42pm
6-K
EX-99.2
6a94opciyx
6 Aug 21
Condensed Interim Consolidated Financial Statements
12:00am
6-K
EX-99.1
8i4qf 3v1dl
6 Aug 21
Orla Mining Reports Second Quarter 2021 Results and Provides Camino Rojo Construction Update
12:00am
6-K
EX-99.1
f3p7a re3
28 Jul 21
Current report (foreign)
9:39am
SUPPL
5xeogcnizg2j
6 Jul 21
Supplemental materials (foreign)
6:02am
6-K
EX-99.2
esid0mm7brf2tjyc
13 May 21
Condensed Interim Consolidated Financial Statements
4:47pm
40-F
EX-99.1
8jgyxbinsbxyn
22 Mar 21
Annual report (Canada)
12:00am
40-F
EX-99.2
0iz6ven69ucl
22 Mar 21
Annual report (Canada)
12:00am
F-10/A
4i94lsibk7sdzy7
12 Mar 21
Registration of securities (Canada) (amended)
4:28pm